Underfloor installation duct, 3-compartment
產品簡介
Underfloor installation duct, 3-compartment
產品詳細信息
Underfloor installation duct for routing cables under the screed.
An important precondition for correct underfloor installation is the screed structure.
In the case of a screed-covered system, it is important that the screed thickness of the duct is at least 35 mm, to avoid the formation of cracks (DIN 18560).
Screed height: 60 mm only for on-floor connection technology (Telitank), 70 mm or more for underfloor connection technology.
Type |
Dimension a mm |
Dimension b mm |
Dimension h mm |
Width mm |
Length mm |
Number of compartments St. |
Cross-section, draw 1 mm² |
Cross-section, draw 2 mm² |
Cross-section, draw 3 mm² |
Pack m |
Weight kg/100 m |
Art.-No. | Add to item list |
S3 25048 | 90 | 70 | 48 | 250 | 2000 | 3 | 4048 | 3174 | 4048 | 2 | 500.000 | 7400332 |
![]() |
S3 35048 | 120 | 110 | 48 | 350 | 2000 | 3 | 5428 | 5014 | 5428 | 2 | 650.000 | 7400344 |
![]() |
![]() |
Steel |
![]() |
Strip galvanised | price/m |

Download Datasheet (PDF)